15 Mining Areas: Provincial [NAT]
Show Customization Window
Export to XLS
Export to XLSX
Export to CSV
v
Region Not filtered
Project Code Not filtered
Asset Type Not filtered
Project Status Not filtered
Physical location Not filtered
Project Name Not filtered
Project Description Not filtered
Total Project Cost Not filtered
Total Funding Not filtered
Current Year Funding Not filtered
Project Start Date Not filtered
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Free StateFSR002Regional BulkConstructionUpgrade WTW at Jagersfontein and construct 11 km pipeline to FauresmithJagersfontein /Fauresmith BWS Phase 2Phase 2 aims to supply additional water for mining operations at Jagersfontein and to connect a dedicated supply to Fauresmith. The following components are to be constructed under this phase:  Install Pump Stations with remaining 67% of pumping capacity.  Upgrade capacity of Jagersfontein Water Treatment Works (to 4Mℓ/d).  Construct additional storage facility at Fauresmith with capacity of 1.5Mℓl/d  Construct 11 km clean water pipeline from Jagersfontein WTW to Fauresmith R 66 000 000,00R 45 695 931,95R 0,002012/13
Free StateFSR007External Potable BulkConstructionMaluti a Phofung ( Qwa-qwa)Sterkfontein Dam Scheme Phase 1Bulk water supply to the rural Qwaqwa areas being Kerstell, Tsiame, Phuthaditjhaba, Tshiame, Makgolokweng & Diatalawa Settlements. The bulk water supply project falls within the Maluti a Phofung Local municipality area of jurisdiction within the district Thabo Mofutsanyane district. It is devided into two phases. The first phase of the project scope is comprising of 3Ml/d Water Treatment Works, 3Ml Storage Reservoir and a pumping mains 6,6 km. Phase 2 of the project, entails the construction of a 45 km pipeline, 3 x 2ML/d reserviors to the rural areas of Qwaqwa & supply to Kerstel which is in construction.The second phase will also include the Mechanical and Electrical equipping of the water treatment plant. R 272 145 756,00R 173 507 079,00R 0,002007/08
Free StateFSR008Regional BulkCompletedChristiana, Hertzogville areaTokologo Regional Water Supply Phase 1The intention of the project is to creates adequete strorage and distributes water to the towns of Boshoff, Hertzogville and Dealesville for domestic usage for current and future demands. The Project is implimented as Follow: a) Abstraction works near the Christiana, Along the Vaal River; b) Pump Station and raw water strorage dam near Christiana , along Vaal River c) Raw water pipeline , 300 mm diameter , about 42 km long , parallel to R708 Road d) Water treatment plant , capacity 3.0 Ml/d e) Raw water storage dam at the water treatment plant (WTP) F) Clear water storage reservoir at the (WTP) g) Raw water pump station at Christiana h) Clear water pump station at HertzogvilleR 123 496 320,00R 115 177 426,00R 0,002007/08
Free StateFSR003Regional BulkCompletedDihlabeng Local Municipality for Paul Roux, Rosendal and Fouriesburg towns Dihlabeng Bulk Water Supply Phase 1In 2010 the Implementation Readiness Study for the Paul Roux bulk water scheme recommended the construction of pipeline from Morelig Reservoir in Bethlehem. This reservoir received potable water from the WTW at the Sol Plaatjies Dam in Bethlehem. From Morelig the water will then be pumped to Meyerskop (halfway between Bethlehem and Paul Roux). From Meyerskop water will gravitate to the new reservoir at Paul Roux. R 73 487 998,00R 70 069 802,00R 0,002011/12
Free StateFSR006Regional BulkConstructionPhumelela LM is situated in the area of jurisdiction of the Thabo Mafutsanyana DMPhumelela Bulk Water SupplyConstruction of 3Mℓ Reservoir, Construction of Ezenzeleni Pump Station with pipeline and construction of Ezenzeleni Water Treatment WorksR 166 000 000,00R 76 228 895,54R 0,002011/12
Free StateFSR009Regional BulkFeasibilityNgwathe LMNgwathe Bulk Sewer Phase 2 (Vredefort)The primary focus of the project is to do the refurbishment of electrical and mechanical equipment at Vredefort WWTW, to refurbish and upgrade three pump stations (Thula section, Vredeshoop and Scrapyard pump stations)R 160 000 000,00R 17 530 841,00R 0,002013/14
Free StateFSR010Raw Water BulkConstructionLocated in the Steynsrus / Matlwanglwang area of Moqhaka Local Municipality.Moqhaka Bulk Water Supply (Steynsrus)Water supply to a population of 7,858 in Steynsrus, 28,469 in Viljoenskroon, and 85,378 in Kroonstad The objective is to implement a sustainable regional bulk water supply scheme in the Moqhaka Local Municipal area, specifically for Steynsrus, Kroonstad and Viljoenskroon. Steynsrus is currently supplied from Vals river upstream which runs dry during certain seasons of the year and the water would have to be transported from Kroonstad. The proposed scope of works includes Vals River Intake Works and Pump Stations and storage facilities. Viljoenskroon is currently supplied from Vaal and Rhenoster Rivers. Rhenoster river frequently runs dry then Vaal is a backup source. Proposed scheme includes rising main from Vaal to Rhenoster river then to Viljonskroon, and Pump station. Kroonstad is currently served from Vals river with a town of Maokeng supplied from boreholes. The proposed scope of work includes ground water supply in Kroonstad as an immediate solution with further developmentR 160 004 486,40R 35 481 575,00R 0,002011/12
Free StateFSR011Raw Water BulkConstructionMasilonyana- Lejweleputsswa District Municipality-BrandfortMasilonyana Bulk Water SupplyCONSTRUCTION OF THE RAW WATER BULK PIPELINE FROM SANDVET CANAL TO BRANDFORT WATER TREATMENT WORKS R 82 785 384,18R 72 293 864,00R 0,002013/14
Free StateFSR016Regional BulkFeasibilityLetsemengLetsemeng- Petrusburg, Koffiefontein BWSWill now be implemented through MWIGR 0,00R 413 660,00R 0,00Unknown
Free StateFSR017Regional BulkFeasibilityTswelopeleTswelopele Bulk Water SupplyTswelopele Bulk Water SupplyR 85 000 000,00R 830 439,44R 0,00Unknown
Free StateFSR005Raw Water BulkConstructionMohokare, Rouxville, Zastron and Smithfield. Mohokare Bulk Water SupplyPhase 1: Water abstruction point at the Orange river, construction of a desilting dam, upgrade water treatment works, pumping mains, pump stations and storage reservoirs. Phase2: Smithfield and Zastron towns will comprise: Upgrade intake works at the Caledon river, upgrade WTW, 2 storage reserviors & pumping mains. R 161 000 000,00R 75 622 109,00R 0,002012/13
Free StateFSR012Raw Water BulkConstruction Nketoane Local Municipaliyt is situated approximately 200km South of Johanesburg in the Free StateNketoana Regional Water Supply augmentationWater supply to 62,363 people in 14,905 households. Petrus Steyn and Mamafubedu. Upgrading of WTW at Rietz from 15Ml/d to 17Ml/day and construction of the High Lift Pump Station at Reitz WTW. Construction of 40km 315mm. mPVC bulk water supply pump line from Rietz to Petruz Steyn. Constrction of 15 km 315 mm mPvc Bulk Water supply pump line from Reitz WTW to Rietz. construction of 1Ml reservoir at Petruz Steyn as well as construction of Pump Station at Petrus Steynz. EIA for the entire Project. Construction of 38.7km 250mm uPVC bulk water supply pipeline from Ptrus Steyns to Lindly. construction of 1.5Ml reservoir at Lindley. construction of 19.4 km 250 uPVC bulk water supply pipeline from Lindley to Arlington. construction of Pump Station at Lindley. Upgrade Borehole Water Supply in Arlington. Construction of 2Ml storage reservoir at Arlington.R 167 434 878,00R 38 008 641,00R 0,002012/13
Free StateFSR002Regional BulkCompleted Jagersfontein /Fauresmith Bulk Water Supply Phase 1The following components were constructed under this phase:  Construct a Water Treatment Works at Jagersfontein (2 Mℓ/d capacity).  Construct the 47km pipeline from the Kalkfontein Dam to Jagersfontein.  Construct and install pump stations with 33% of pumping capacity at phase1 stage.  Construct Raw Water Storage Dam in Jagersfontein at the Water Treatment Plant. R 75 775 368,00R 16 923 101,00R 0,002007/08
Free StateFSR023Regional BulkDesignDealesville, Boshoff and neighbouring farms. Tokologo Bulk Water Supply Phase 2 The Tokologo Regional Bulk Water Supply Scheme intends to meet the following objectives: a) Create adequate storage and, b) Distribute water to the towns of Boshoff, Hertzogville and Dealesville for domestic usage for current and future demands. R 290 000 000,00R 10 000 000,00R 0,002014/15
Free StateFSR022Regional BulkConstructionDihlabeng Local Municipality for Paul Roux, Rosendal and Fouriesburg towns Dihlabeng Bulk Water Supply Phase 2This reservoir received potable water from the WTW at the Sol Plaatjies Dam in Bethlehem. From Morelig the water will then be pumped to Meyerskop (halfway between Bethlehem and Paul Roux). From Meyerskop water will gravitate to the new reservoir at Paul Roux. R 255 000 000,00R 25 000 000,00R 0,002014/15
Free StateFSR024Regional BulkConstructionMaluti-a-PhofungMaluti-a-Phofung BWS Phase 2 Maluti-a-PhofungR 240 000 000,00R 34 896 000,00R 0,002012/13
Free StateFSR004Regional BulkCompletedNgwathe LMNgwathe Bulk Water Supply Phase 1phase 1R 14 710 191,00R 5 474 890,73R 0,002007/08
Free StateFSR020WaterConstruction Ngwathe Bulk Water SupplyNgwathe Bulk Water SupplyR 250 000 000,00R 13 100 000,00R 0,002013/14
Free StateFSR021Water and SanitationConstruction Frankfort Bulk SewerFrankfort Bulk SewerR 120 000 000,00R 10 000 000,00R 0,002014/15
Free StateFSR013Regional BulkConstruction0Setsoto Bulk Water SupplyThe Setsoto Bulk Water Supply Scheme is implemented to ensure a sustainable and long-term solution for the water supply problems that had been experienced in the Ficksburg, Clocolan, Marquard and Senekal areas. Phase 1 was the installation of boreholes in Ficksburg, Clocolan, Marquard and Senekal Phaser 2: Raising of the Sandspruit Weir – De Put Phase 3: Caledon to Meulspruit raw water pipelineR 147 644 899,00R 42 644 899,00R 0,002011/12
Free StateFSR014Regional BulkFeasibilityNaledi borders the Kingdom of Lesotho in the east, Mangaung Metropolitan Municipality to the north,Naledi Bulk Water SupplyNaledi Bulk Water Supply: From this study it can be seen that there is bulk water requirement need that should be addressed. The following is the proposed scope for the next phases of study. • Technical feasibility study • Preliminary design • ImplementationR 140 000 000,00R 370 000,00R 0,002012/13
Free StateFSR015Regional BulkConstructionMantsopaMantsopa- Tweespruit, Excelsior, Hobhouse Bulk Water SupplyUpgrading of Bulk Water Supply to the New Provincial Hospital, LadybrandR 61 306 333,00R 7 746 333,00R 0,002014/15
GautengGPR005Raw Water BulkConstruction Sebokeng Waste Water Treatment Works (Sub project Sedibeng)Extension of Sebokeng WWTW from the current capacity of 100Ml to 200MlR 1 123 584 000,00R 199 949 236,04R 0,002012/13
GautengGPR006Raw Water BulkConstruction Meyerton Waste Water Treatment Works (Sub project Sedibeng) Extension of the Meyerton WWTW from the current capacity of 10Ml to 25MlR 257 462 000,00R 34 462 189,06R 0,002014/15
GautengGPR007Regional BulkDesignWestonaria Westonaria WWTW (Zuurbekom)•The project is for the 15 Mℓ/d extension to the existing HvN WWTW in Westonaria. The removal of nutrients will occur with the use of Biological Nutrient Removal (BNR). •The head of works will have a mechanical screen, two coarse mechanical screens, a screen bypass with a mechanical screen, two Vortex degritters, with associated equipment, one mechanical fine screen and two flat bottom Parshall flumes with flow measuring devices. •The flow and load will be balanced via a Balancing Tank and biological nutrient removal will be done via an Activated Sludge Reactor with its associated recycles. The treatment works will be able to run in a 3 stage Phoredox, UCT, Modified UCT and Johannesburg mode. •The return activated sludge will be collected in two Clarifiers. Disinfection will be via chlorine gas dosing and Chlorine Contact Channels. •Thickening and drying of the waste activated sludge will produce compost which will be made available to local farmers.R 621 520 000,00R 39 700 000,00R 0,002015/16
GautengGPR001Raw Water BulkDesign Sedibeng Bulk Regional Sewerage SchemeConstruction of a regional sewer scheme with capacity of 150Ml per day. Increase the capacity of Sedibeng Waste Water Treatment Works by 100ML capacity per day as well as increase the capacity of Midvaal waste water treatment by 15ML per day Construction of a water reclamation scheme. R 2 400 000 000,00R 25 244 000,00R 0,002015/16
GautengGPR004Raw Water BulkConstruction Western Highveld SchemeWater Treatment Works. Refurbishment of the Bronkhorstspruit Water Treatment Works to ensure more supply into the Western Highveld Scheme. An additional 30 Ml/d to be supplied by Rand Water, via the Mamelodi pipeline, into the systemR 486 000 000,00R 151 233 256,73R 0,002012/13
LimpopoLPR011Raw Water BulkConstructionGa- Masha, Ngwaritsi, Vergelegen, Mid Ngwaritsi, Leppellane, Nkadimeng, Schoonoord, Eerstegeluk, SpiNebo Bulk Water SupplyConstruction of 33 km Steelpipe OD 450mm, 2 X Pump Station, 10ml Reservior and Water Treament Works (10Ml/day , 12Ml/day Summer Peak Demand) to supply water to several communities around Ga- Masha, Ngwaritsi, Vergelegen, Mid Ngwaritsi, Leppellane, Nkadimeng, Schoonoord, Eerstegeluk, Spitskop, Mahlangu, Sephaku, Zaaiplaats, Annex A, Kalkfotein, Piet Gouws West and Piet Gouws East. Nebo Bulk Water Supply Project as reflected in the 2006 Nebo Master Plan comprises of the phases mentioned below. • Phase 1A is the 33kms pipeline and 2 pump stations from the De Hoop Water Treatment Works (Phase 1 B) to the 20Mlitre Command reservoir (Phase 1C) being constructed in Jane Furse. • Phase 2 –has never been considered (upgrading of Wegelegen Water Treatment Works, which currently supplies Jane Furse and surrounding villages). • Phase 3A –Pipeline from Jane Furse to Lobethal. • Phase 3 B –Construction of the pipeline of about 9,45 Km from Jane Furse to Marulaneng. • Phase 3C –PipelineR 978 400 000,00R 139 636 562,00R 0,002007/08
LimpopoLPR012Regional BulkConstruction Ga-Maroga, Driekop, Mooihoek, Riba Cross, Ga- Riba, Mandela Makgemeng, Madiseng, Mashamothane, BothMooihoek/Tubatse Bulk Water SupplyBulk Water Supply 24km Phase 1 and Phase2 steel pipelines cement mortar lined OD 660mm ( from Lebalelo Mooihoek WTW). Pipe is route along R37 (Ga Maroga, Driekpo, Riba cross, Madibaneng, Mashomothane and outsite Burgersfort), Phase 3- 14km Steel pipeline cement mortar OD 320mm- 560mm (Pipe connect from Mashamothane intersection pipe route is Mashmothane, Bothashoek and Praktiseer. Phase 4 17.5km Steelpipe cement mortar line OD 150mm-550mm. Pipe route along R555 Ohristad route - Turnoff Penge,then link to Praktiseer connection completed under Phase 3. Close to 16 Reservoirs ranging from 0.2 ML/d - 5ML/d, Phase 5 Gravity mains 150- 200 dia steel pipe Klambon cut grooved, SP cast coupling, Tosa wrapped and lined (30km) connecting ,(Ga Maroga, Driekpo, Riba cross, Madibaneng, Mashomothane, Makgekeng, Madiseng Manoke, Ga Motodi, Mabotsha, Penge, Alverton and Burgersfort) Mooihoek 8ML treatment plantsR 714 000 000,00R 170 402 825,00R 0,002007/08
LimpopoLPR017Raw Water BulkConstructionThe OaksMametja Sekororo Bulk Water SupplyConstruction of a 15 ML/Day Water Treatment Works at the Oaks/ Willows. Construction of a 1,6 km rising main pipeline to connect to the Oaks. Construction of 1,2 km rising main pipeline to the Willows. Construction of one command reservoir with the capacity of 15 ML and two substantial storage reservoirs, 400 kl and 200 kl respectively. R 250 718 000,00R 155 551 224,00R 0,002012/13
LimpopoLPR018Raw Water BulkConstructionGiyaniGiyani Bulk Water Supply Drought ReliefThe project is to solve the extreme water shortages problem that is currently being experienced by communities in areas which are relying on water supply from the Middle Letaba Dam (and smaller Nsami Dam) due to the drier period at the catchment area. The raw water will be extracted from Nandoni dam to Nsami dam in Giyani. Currently the project is on hold as LNW is putting in place the necessary arrangements to make sure the project is completed.R 208 919 000,00R 108 918 842,00R 0,002011/12
LimpopoLPR019Regional BulkConstructionMoutse East (Groblersdal) (28 villages) and Moutse West (12 villages)Moutse Bulk Water SupplyContract1: Upgrading of Groblersdal Water Treatment works by additional 18ML. Contract 2: Construction of 6.5km, 500 mm dia pipeline from Groblersdal WTW to the existing 10ML reservoir outside Groblersdal tow. Contract 3: Construction of 29.857 km 600mm dia pipeline from Groblersdal Reservoir to the proposed 10ML new reservoir at LusakaContract 4: Construction of 250mm dia 6.676km long branch pipeline. Contract 5: Construction of 60.720km, 400mm dia long gravity main from Lusaka reservoir to Moutse West. Contract 6: Construction of 10ML Lusaka reservoir. Contract 7: Construction of Groblersdal West pump station. R 413 578 000,00R 348 628 339,00R 0,002011/12
LimpopoLPR015Regional BulkConstructionMogalakwena Local MunicipalityMogalakwena Bulk Water SupplyThe project goal is to provide bulk water conveyance infrastructure that would ultimately carry water for both domestic and mine use from Flag Boshielo Dam augmentation scheme to the residential areas in the Mogalakwena municipal area ( Urban, Peri-Urban and Rural areas). Based on the Mogalakwena Water Master Plan, the project is divided into a number of sub-projects at various stages of implementation and these are : (1a) Bulk Potable Pipe : Fothane to Seema, Ga-Tshaba, Ramurulana, (1b) Planknek and Weenen Boreholes (2) Bulk Potable Pipe : First Section from Fothane to Mesapotamia, (3) Bulk Wellfield Pipe : Weenen to Mokopane, (4) Bulk Wellfield Strorage : 2,5Ml Reservoir, (5) Bulk Raw Pipe : Piet-se-Kop to Tshamahansi, (6) Bulk Potable Pipe : Sekuruwe to Fothane, (7) Bulk Raw Pipe : Tshamahansi to Sekuruwe - including temporary storage, (8)Tshamahansi Cluster : Tshamahansi Village (8a) Tshamahansi Cluster : Fencing (8b) Tshamahansi Cluster : Storage Tanks and Chambers (8c) TshamahR 1 012 369 000,00R 468 000 823,00R 0,002007/08
LimpopoLPR006Regional BulkFeasibilityTzaneen LMNwamitwa RWS Scheme(Great Letaba)Supply raw water from the Groot Letaba River, and in future from the Nwamitwa Dam to be constructed to the Nkambaku Water Treatment Works where it will be purified and distributed to some 350 000 people in Letaba, Tzaneen and Giyani Local MunicipalitiesR 644 000 000,00R 0,00R 0,00Unknown
LimpopoLPR002WaterFeasibilityNorth east from Makhado (Louis Trichardt)Nzhelele Valley Bulk Water SupplyThe purpose of this study is to identify the most appropriate water supply strategy for the Nzhelele Valley giving full consideration to all the available water resources within the Nzhhelele Valley borders as well as the integration with other bulk water supply schemes. R 600 000 000,00R 541 523,00R 0,00Unknown
LimpopoLPR001WaterFeasibility15 villages which is located halfway between Polokwane and Loius trichards (Makhado). Matoks Regional Water SchemeMatoks Regional Bulk Water Scheme scoping report technical feasibility report IRS reportR 0,00R 1 763 934,00R 0,00Unknown
LimpopoLPR008WaterFeasibilityPOLOKWNA LOCAL MUNICIPALITYGlen Alphine Regional Water SupplyObtain the latest existing infrastructure status. Obtain the latest existing population and growth figures. Primary Water Requirement. Assist in compiling Water Use Licenses. Reconfirm design details as per original report. Assist in appointing an Environmental Consultant Assist in negotiations with the municipalities involved on the implementation process. R 345 000 000,00R 598 603,00R 0,002016/17
LimpopoLPR003Regional BulkFeasibilityThe Waterberg District Municipality comprises of six local municipalities namely Mogalakwena, LephalLephalale - Bulk Water AugmentationSCOPING REPORT TECHNICAL FEASIBILITY REPORT PRELIMINARY DESIGN REPORT IMPLEMENTATION READINESS STUDY REPORTR 0,00R 1 482 400,00R 0,00Unknown
LimpopoLPR004Raw Water BulkFeasibilityBela Bela local municipality modimolle mookgopongMagalies Water to WaterbergMagalies Water to Waterberg. scoping report technical feasibility study preliminary design implementation ready studiesR 0,00R 701 683,00R 0,002015/16
LimpopoLPR020Regional BulkFeasibilityMusina,Vhembe,Makhado,Mutale and Thulamela.Provincial High Catalytic Projects - Mutash Hub Bulk Water SupplyProvincial High Catalytic Projects - Mutash HubR 0,00R 1 952 332,00R 0,002015/16
LimpopoLPR022Regional BulkFeasibilityAganang Local Municipality area is situated 20 km North West of Polokwane and 45 km North of MokopanAganang Bulk Water SupplyAganang Bulk Water Supply scoping report technical feasibility study report Preliminary Design Report Implementation Readiness StudiesR 38 000 000,00R 661 000,00R 0,002015/16
LimpopoLPR023Regional BulkFeasibilityPolokwane Polokwane Waste Water Treatment Works Advanced BNR Activated Sludge Process with surface mounted aerators Extended Aeration Activated Sludge Process mounted aerators MBR Membrane Reactor Process Scoping report technical feasibility study report R 113 269 000,00R 1 269 000,00R 0,002015/16
LimpopoLPR024Regional BulkFeasibility Capricorn MasterplanCapricorn MasterplanR 0,00R 405 000,00R 0,00Unknown
LimpopoLPR025Regional BulkPlanning Sekhukhune MasterplanSekhukhune MasterplanR 500 000,00R 300 000,00R 0,00Unknown
LimpopoLPR021Raw Water BulkConstruction Sekhukhune Bulk Water Supply (Moutse)Bulk Water Supply to the Jane Furse and Nebo Plateau areas supplied from the De Hoop Dam. First address the Moutse Bulk Water Supply SchemeR 208 000 000,00R 246 586 728,00R 0,002013/14
LimpopoLPR016Raw Water BulkConstruction Vhembe DM 18 rural villagesSinthumule Kutama Bulk Water AugmentationThe project entails the Bulk Water Supply (BWS) for Makhado, Sinthumule/Kutama, the Louis Trichardt Air Force Base (AFB) and it’s residential area, Braambos, which lies approximately 25 km South-West from Makhado town (formerly Louis Trichardt), the Sinthumule/Kutama rural villages to the west of Makhado town and Makhado town which includes all extensions in Makhado town, Tshikota and the Kutama Sinthumule Maximum Security Prison. The proposed connector lines from the Nooitgedacht boreholes to the proposed future balancing tank and pumping station at Nooitgedacht. Ground water will be pumped from Nooitgedacht pumping facility to Mowkop reservoir to supply Makhado town and extensions with additional water. The proposed pumping station and balancing tank at Nooitgedacht will be designed to ultimately supply water from Nandoni Water Treatment Works to Zones A,B,C and the Louis Trichardt Air Force base. The pumps designed for the ultimate scheme at Nooitgedacht will be utilized to pump to R 477 600 000,00R 203 694 271,00R 0,002007/08
LimpopoLPR009Regional BulkFeasibility Lebalelo Central & North Regional Water SchemeLebalelo Central & North Regional Water SchemeR 120 000 000,00R 10 000 000,00R 0,002015/16
LimpopoLPR007Regional BulkFeasibilitySEKHUKHUNEOhrigstad Bulk Water SupplyWATER SUPPLY AT SEKHUKHUNER 0,00R 79 619,00R 0,002016/17
MpumalangaMPR027Regional BulkFeasibilityChief Albert LuthuliAmsterdam and Sheepmore bulk water schemeAmsterdam and Sheepmore bulk water schemeR 30 503 008,00R 8 581 370,00R 0,002015/16
MpumalangaMPR007Regional BulkCompletedNkomazi/ Mbekisburg x2/ HectorspruitMjejane Trust Bulk Water SupplyMjejane Trust Bulk Water Supply. Abstraction from Crocodile River, raw water dam, water treatment plant and water supply to Mbekisburg. Unfortunately the co-funding was not available and the project was never completedR 17 500 000,00R 0,00R 0,002007/08