15 Mining Areas: Provincial [NAT]
|
|
|
|
|
|
|
| | | | | | | | | | |
| Free State | FSR002 | Regional Bulk | Construction | Upgrade WTW at Jagersfontein and construct 11 km pipeline to Fauresmith | Jagersfontein /Fauresmith BWS Phase 2 | Phase 2 aims to supply additional water for mining operations at Jagersfontein and to connect a dedicated supply to Fauresmith.
The following components are to be constructed under this phase:
Install Pump Stations with remaining 67% of pumping capacity.
Upgrade capacity of Jagersfontein Water Treatment Works (to 4Mℓ/d).
Construct additional storage facility at Fauresmith with capacity of 1.5Mℓl/d
Construct 11 km clean water pipeline from Jagersfontein WTW to Fauresmith
| R 66 000 000,00 | R 45 695 931,95 | R 0,00 | 2012/13 |
| Free State | FSR007 | External Potable Bulk | Construction | Maluti a Phofung ( Qwa-qwa) | Sterkfontein Dam Scheme Phase 1 | Bulk water supply to the rural Qwaqwa areas being Kerstell, Tsiame, Phuthaditjhaba, Tshiame, Makgolokweng & Diatalawa Settlements. The bulk water supply project falls within the Maluti a Phofung Local municipality area of jurisdiction within the district Thabo Mofutsanyane district. It is devided into two phases. The first phase of the project scope is comprising of 3Ml/d Water Treatment Works, 3Ml Storage Reservoir and a pumping mains 6,6 km. Phase 2 of the project, entails the construction of a 45 km pipeline, 3 x 2ML/d reserviors to the rural areas of Qwaqwa & supply to Kerstel which is in construction.The second phase will also include the Mechanical and Electrical equipping of the water treatment plant. | R 272 145 756,00 | R 173 507 079,00 | R 0,00 | 2007/08 |
| Free State | FSR008 | Regional Bulk | Completed | Christiana, Hertzogville area | Tokologo Regional Water Supply Phase 1 | The intention of the project is to creates adequete strorage and distributes water to the towns of Boshoff, Hertzogville and Dealesville for domestic usage for current and future demands.
The Project is implimented as Follow:
a) Abstraction works near the Christiana, Along the Vaal River;
b) Pump Station and raw water strorage dam near Christiana , along Vaal River
c) Raw water pipeline , 300 mm diameter , about 42 km long , parallel to R708 Road
d) Water treatment plant , capacity 3.0 Ml/d
e) Raw water storage dam at the water treatment plant (WTP)
F) Clear water storage reservoir at the (WTP)
g) Raw water pump station at Christiana
h) Clear water pump station at Hertzogville | R 123 496 320,00 | R 115 177 426,00 | R 0,00 | 2007/08 |
| Free State | FSR003 | Regional Bulk | Completed | Dihlabeng Local Municipality for Paul Roux, Rosendal and Fouriesburg towns | Dihlabeng Bulk Water Supply Phase 1 | In 2010 the Implementation Readiness Study for the Paul Roux bulk water scheme recommended the construction of pipeline from Morelig Reservoir in Bethlehem. This reservoir received potable water from the WTW at the Sol Plaatjies Dam in Bethlehem. From Morelig the water will then be pumped to Meyerskop (halfway between Bethlehem and Paul Roux). From Meyerskop water will gravitate to the new reservoir at Paul Roux.
| R 73 487 998,00 | R 70 069 802,00 | R 0,00 | 2011/12 |
| Free State | FSR006 | Regional Bulk | Construction | Phumelela LM is situated in the area of jurisdiction of the Thabo Mafutsanyana DM | Phumelela Bulk Water Supply | Construction of 3Mℓ Reservoir, Construction of Ezenzeleni Pump Station with pipeline and construction of Ezenzeleni Water Treatment Works | R 166 000 000,00 | R 76 228 895,54 | R 0,00 | 2011/12 |
| Free State | FSR009 | Regional Bulk | Feasibility | Ngwathe LM | Ngwathe Bulk Sewer Phase 2 (Vredefort) | The primary focus of the project is to do the refurbishment of electrical and mechanical equipment at Vredefort WWTW, to refurbish and upgrade three pump stations (Thula section, Vredeshoop and Scrapyard pump stations) | R 160 000 000,00 | R 17 530 841,00 | R 0,00 | 2013/14 |
| Free State | FSR010 | Raw Water Bulk | Construction | Located in the Steynsrus / Matlwanglwang area of Moqhaka Local Municipality. | Moqhaka Bulk Water Supply (Steynsrus) | Water supply to a population of 7,858 in Steynsrus, 28,469 in Viljoenskroon, and 85,378 in Kroonstad The objective is to implement a sustainable regional bulk water supply scheme in the Moqhaka Local Municipal area, specifically for Steynsrus, Kroonstad and Viljoenskroon. Steynsrus is currently supplied from Vals river upstream which runs dry during certain seasons of the year and the water would have to be transported from Kroonstad. The proposed scope of works includes Vals River Intake Works and Pump Stations and storage facilities. Viljoenskroon is currently supplied from Vaal and Rhenoster Rivers. Rhenoster river frequently runs dry then Vaal is a backup source. Proposed scheme includes rising main from Vaal to Rhenoster river then to Viljonskroon, and Pump station. Kroonstad is currently served from Vals river with a town of Maokeng supplied from boreholes. The proposed scope of work includes ground water supply in Kroonstad as an immediate solution with further development | R 160 004 486,40 | R 35 481 575,00 | R 0,00 | 2011/12 |
| Free State | FSR011 | Raw Water Bulk | Construction | Masilonyana- Lejweleputsswa District Municipality-Brandfort | Masilonyana Bulk Water Supply | CONSTRUCTION OF THE RAW WATER BULK PIPELINE FROM SANDVET CANAL TO BRANDFORT WATER TREATMENT WORKS
| R 82 785 384,18 | R 72 293 864,00 | R 0,00 | 2013/14 |
| Free State | FSR016 | Regional Bulk | Feasibility | Letsemeng | Letsemeng- Petrusburg, Koffiefontein BWS | Will now be implemented through MWIG | R 0,00 | R 413 660,00 | R 0,00 | Unknown |
| Free State | FSR017 | Regional Bulk | Feasibility | Tswelopele | Tswelopele Bulk Water Supply | Tswelopele Bulk Water Supply | R 85 000 000,00 | R 830 439,44 | R 0,00 | Unknown |
| Free State | FSR005 | Raw Water Bulk | Construction | Mohokare, Rouxville, Zastron and Smithfield. | Mohokare Bulk Water Supply | Phase 1: Water abstruction point at the Orange river, construction of a desilting dam, upgrade water treatment works, pumping mains, pump stations and storage reservoirs. Phase2: Smithfield and Zastron towns will comprise: Upgrade intake works at the Caledon river, upgrade WTW, 2 storage reserviors & pumping mains. | R 161 000 000,00 | R 75 622 109,00 | R 0,00 | 2012/13 |
| Free State | FSR012 | Raw Water Bulk | Construction |
Nketoane Local Municipaliyt is situated approximately 200km South of Johanesburg in the Free State | Nketoana Regional Water Supply augmentation | Water supply to 62,363 people in 14,905 households. Petrus Steyn and Mamafubedu. Upgrading of WTW at Rietz from 15Ml/d to 17Ml/day and construction of the High Lift Pump Station at Reitz WTW. Construction of 40km 315mm. mPVC bulk water supply pump line from Rietz to Petruz Steyn. Constrction of 15 km 315 mm mPvc Bulk Water supply pump line from Reitz WTW to Rietz. construction of 1Ml reservoir at Petruz Steyn as well as construction of Pump Station at Petrus Steynz. EIA for the entire Project. Construction of 38.7km 250mm uPVC bulk water supply pipeline from Ptrus Steyns to Lindly. construction of 1.5Ml reservoir at Lindley. construction of 19.4 km 250 uPVC bulk water supply pipeline from Lindley to Arlington. construction of Pump Station at Lindley. Upgrade Borehole Water Supply in Arlington. Construction of 2Ml storage reservoir at Arlington. | R 167 434 878,00 | R 38 008 641,00 | R 0,00 | 2012/13 |
| Free State | FSR002 | Regional Bulk | Completed | | Jagersfontein /Fauresmith Bulk Water Supply Phase 1 | The following components were constructed under this phase:
Construct a Water Treatment Works at Jagersfontein (2 Mℓ/d capacity).
Construct the 47km pipeline from the Kalkfontein Dam to Jagersfontein.
Construct and install pump stations with 33% of pumping capacity at phase1 stage.
Construct Raw Water Storage Dam in Jagersfontein at the Water Treatment Plant.
| R 75 775 368,00 | R 16 923 101,00 | R 0,00 | 2007/08 |
| Free State | FSR023 | Regional Bulk | Design | Dealesville, Boshoff and neighbouring farms. | Tokologo Bulk Water Supply Phase 2 | The Tokologo Regional Bulk Water Supply Scheme intends to meet the following objectives:
a) Create adequate storage and,
b) Distribute water to the towns of Boshoff, Hertzogville and Dealesville for domestic usage for current and future demands.
| R 290 000 000,00 | R 10 000 000,00 | R 0,00 | 2014/15 |
| Free State | FSR022 | Regional Bulk | Construction | Dihlabeng Local Municipality for Paul Roux, Rosendal and Fouriesburg towns | Dihlabeng Bulk Water Supply Phase 2 | This reservoir received potable water from the WTW at the Sol Plaatjies Dam in Bethlehem. From Morelig the water will then be pumped to Meyerskop (halfway between Bethlehem and Paul Roux). From Meyerskop water will gravitate to the new reservoir at Paul Roux.
| R 255 000 000,00 | R 25 000 000,00 | R 0,00 | 2014/15 |
| Free State | FSR024 | Regional Bulk | Construction | Maluti-a-Phofung | Maluti-a-Phofung BWS Phase 2 | Maluti-a-Phofung | R 240 000 000,00 | R 34 896 000,00 | R 0,00 | 2012/13 |
| Free State | FSR004 | Regional Bulk | Completed | Ngwathe LM | Ngwathe Bulk Water Supply Phase 1 | phase 1 | R 14 710 191,00 | R 5 474 890,73 | R 0,00 | 2007/08 |
| Free State | FSR020 | Water | Construction | | Ngwathe Bulk Water Supply | Ngwathe Bulk Water Supply | R 250 000 000,00 | R 13 100 000,00 | R 0,00 | 2013/14 |
| Free State | FSR021 | Water and Sanitation | Construction | | Frankfort Bulk Sewer | Frankfort Bulk Sewer | R 120 000 000,00 | R 10 000 000,00 | R 0,00 | 2014/15 |
| Free State | FSR013 | Regional Bulk | Construction | 0 | Setsoto Bulk Water Supply | The Setsoto Bulk Water Supply Scheme is implemented to ensure a sustainable and long-term solution for the water supply problems that had been experienced in the Ficksburg, Clocolan, Marquard and Senekal areas.
Phase 1 was the installation of boreholes in Ficksburg, Clocolan, Marquard and Senekal
Phaser 2: Raising of the Sandspruit Weir – De Put
Phase 3: Caledon to Meulspruit raw water pipeline | R 147 644 899,00 | R 42 644 899,00 | R 0,00 | 2011/12 |
| Free State | FSR014 | Regional Bulk | Feasibility | Naledi borders the Kingdom of Lesotho in the east, Mangaung
Metropolitan Municipality to the north, | Naledi Bulk Water Supply | Naledi Bulk Water Supply: From this study it can be seen that there is bulk water requirement need that should be addressed. The following is the proposed scope for the next phases of study.
• Technical feasibility study
• Preliminary design
• Implementation | R 140 000 000,00 | R 370 000,00 | R 0,00 | 2012/13 |
| Free State | FSR015 | Regional Bulk | Construction | Mantsopa | Mantsopa- Tweespruit, Excelsior, Hobhouse Bulk Water Supply | Upgrading of Bulk Water Supply to the New Provincial Hospital, Ladybrand | R 61 306 333,00 | R 7 746 333,00 | R 0,00 | 2014/15 |
| Gauteng | GPR005 | Raw Water Bulk | Construction | | Sebokeng Waste Water Treatment Works (Sub project Sedibeng) | Extension of Sebokeng WWTW from the current capacity of 100Ml to 200Ml | R 1 123 584 000,00 | R 199 949 236,04 | R 0,00 | 2012/13 |
| Gauteng | GPR006 | Raw Water Bulk | Construction | | Meyerton Waste Water Treatment Works (Sub project Sedibeng) | Extension of the Meyerton WWTW from the current capacity of 10Ml to 25Ml | R 257 462 000,00 | R 34 462 189,06 | R 0,00 | 2014/15 |
| Gauteng | GPR007 | Regional Bulk | Design | Westonaria | Westonaria WWTW (Zuurbekom) | •The project is for the 15 Mℓ/d extension to the existing HvN WWTW in Westonaria. The removal of nutrients will occur with the use of Biological Nutrient Removal (BNR).
•The head of works will have a mechanical screen, two coarse mechanical screens, a screen bypass with a mechanical screen, two Vortex degritters, with associated equipment, one mechanical fine screen and two flat bottom Parshall flumes with flow measuring devices.
•The flow and load will be balanced via a Balancing Tank and biological nutrient removal will be done via an Activated Sludge Reactor with its associated recycles. The treatment works will be able to run in a 3 stage Phoredox, UCT, Modified UCT and Johannesburg mode.
•The return activated sludge will be collected in two Clarifiers. Disinfection will be via chlorine gas dosing and Chlorine Contact Channels.
•Thickening and drying of the waste activated sludge will produce compost which will be made available to local farmers. | R 621 520 000,00 | R 39 700 000,00 | R 0,00 | 2015/16 |
| Gauteng | GPR001 | Raw Water Bulk | Design | | Sedibeng Bulk Regional Sewerage Scheme | Construction of a regional sewer scheme with capacity of 150Ml per day.
Increase the capacity of Sedibeng Waste Water Treatment Works by 100ML capacity per day as well as increase the capacity of Midvaal waste water treatment by 15ML per day
Construction of a water reclamation scheme.
| R 2 400 000 000,00 | R 25 244 000,00 | R 0,00 | 2015/16 |
| Gauteng | GPR004 | Raw Water Bulk | Construction | | Western Highveld Scheme | Water Treatment Works. Refurbishment of the Bronkhorstspruit Water Treatment Works to ensure more supply into the Western Highveld Scheme. An additional 30 Ml/d to be supplied by Rand Water, via the Mamelodi pipeline, into the system | R 486 000 000,00 | R 151 233 256,73 | R 0,00 | 2012/13 |
| Limpopo | LPR011 | Raw Water Bulk | Construction | Ga- Masha, Ngwaritsi, Vergelegen, Mid Ngwaritsi, Leppellane, Nkadimeng, Schoonoord, Eerstegeluk, Spi | Nebo Bulk Water Supply | Construction of 33 km Steelpipe OD 450mm, 2 X Pump Station, 10ml Reservior and Water Treament Works (10Ml/day , 12Ml/day Summer Peak Demand) to supply water to several communities around Ga- Masha, Ngwaritsi, Vergelegen, Mid Ngwaritsi, Leppellane, Nkadimeng, Schoonoord, Eerstegeluk, Spitskop, Mahlangu, Sephaku, Zaaiplaats, Annex A, Kalkfotein, Piet Gouws West and Piet Gouws East. Nebo Bulk Water Supply Project as reflected in the 2006 Nebo Master Plan comprises of the phases mentioned below.
• Phase 1A is the 33kms pipeline and 2 pump stations from the De Hoop Water Treatment Works (Phase 1 B) to the 20Mlitre Command reservoir (Phase 1C) being constructed in Jane Furse.
• Phase 2 –has never been considered (upgrading of Wegelegen Water Treatment Works, which currently supplies Jane Furse and surrounding villages).
• Phase 3A –Pipeline from Jane Furse to Lobethal.
• Phase 3 B –Construction of the pipeline of about 9,45 Km from Jane Furse to Marulaneng.
• Phase 3C –Pipeline | R 978 400 000,00 | R 139 636 562,00 | R 0,00 | 2007/08 |
| Limpopo | LPR012 | Regional Bulk | Construction | Ga-Maroga, Driekop, Mooihoek, Riba Cross, Ga- Riba, Mandela Makgemeng, Madiseng, Mashamothane, Both | Mooihoek/Tubatse Bulk Water Supply | Bulk Water Supply 24km Phase 1 and Phase2 steel pipelines cement mortar lined OD 660mm ( from Lebalelo Mooihoek WTW). Pipe is route along R37 (Ga Maroga, Driekpo, Riba cross, Madibaneng, Mashomothane and outsite Burgersfort), Phase 3- 14km Steel pipeline cement mortar OD 320mm- 560mm (Pipe connect from Mashamothane intersection pipe route is Mashmothane, Bothashoek and Praktiseer. Phase 4 17.5km Steelpipe cement mortar line OD 150mm-550mm. Pipe route along R555 Ohristad route - Turnoff Penge,then link to Praktiseer connection completed under Phase 3. Close to 16 Reservoirs ranging from 0.2 ML/d - 5ML/d, Phase 5 Gravity mains 150- 200 dia steel pipe Klambon cut grooved, SP cast coupling, Tosa wrapped and lined (30km) connecting ,(Ga Maroga, Driekpo, Riba cross, Madibaneng, Mashomothane, Makgekeng, Madiseng Manoke, Ga Motodi, Mabotsha, Penge, Alverton and Burgersfort) Mooihoek 8ML treatment plants | R 714 000 000,00 | R 170 402 825,00 | R 0,00 | 2007/08 |
| Limpopo | LPR017 | Raw Water Bulk | Construction | The Oaks | Mametja Sekororo Bulk Water Supply | Construction of a 15 ML/Day Water Treatment Works at the Oaks/ Willows. Construction of a 1,6 km rising main pipeline to connect to the Oaks. Construction of 1,2 km rising main pipeline to the Willows. Construction of one command reservoir with the capacity of 15 ML and two substantial storage reservoirs, 400 kl and 200 kl respectively. | R 250 718 000,00 | R 155 551 224,00 | R 0,00 | 2012/13 |
| Limpopo | LPR018 | Raw Water Bulk | Construction | Giyani | Giyani Bulk Water Supply Drought Relief | The project is to solve the extreme water shortages problem that is currently being experienced by communities in areas which are relying on water supply from the Middle Letaba Dam (and smaller Nsami Dam) due to the drier period at the catchment area. The raw water will be extracted from Nandoni dam to Nsami dam in Giyani. Currently the project is on hold as LNW is putting in place the necessary arrangements to make sure the project is completed. | R 208 919 000,00 | R 108 918 842,00 | R 0,00 | 2011/12 |
| Limpopo | LPR019 | Regional Bulk | Construction | Moutse East (Groblersdal) (28 villages) and Moutse West (12 villages) | Moutse Bulk Water Supply | Contract1: Upgrading of Groblersdal Water Treatment works by additional 18ML. Contract 2: Construction of 6.5km, 500 mm dia pipeline from Groblersdal WTW to the existing 10ML reservoir outside Groblersdal tow. Contract 3: Construction of 29.857 km 600mm dia pipeline from Groblersdal Reservoir to the proposed 10ML new reservoir at LusakaContract 4: Construction of 250mm dia 6.676km long branch pipeline. Contract 5: Construction of 60.720km, 400mm dia long gravity main from Lusaka reservoir to Moutse West. Contract 6: Construction of 10ML Lusaka reservoir. Contract 7: Construction of Groblersdal West pump station. | R 413 578 000,00 | R 348 628 339,00 | R 0,00 | 2011/12 |
| Limpopo | LPR015 | Regional Bulk | Construction | Mogalakwena Local Municipality | Mogalakwena Bulk Water Supply | The project goal is to provide bulk water conveyance infrastructure that would ultimately carry water for both domestic and mine use from Flag Boshielo Dam augmentation scheme to the residential areas in the Mogalakwena municipal area ( Urban, Peri-Urban and Rural areas).
Based on the Mogalakwena Water Master Plan, the project is divided into a number of sub-projects at various stages of implementation and these are : (1a) Bulk Potable Pipe : Fothane to Seema, Ga-Tshaba, Ramurulana, (1b) Planknek and Weenen Boreholes (2) Bulk Potable Pipe : First Section from Fothane to Mesapotamia, (3) Bulk Wellfield Pipe : Weenen to Mokopane, (4) Bulk Wellfield Strorage : 2,5Ml Reservoir, (5) Bulk Raw Pipe : Piet-se-Kop to Tshamahansi, (6) Bulk Potable Pipe : Sekuruwe to Fothane, (7) Bulk Raw Pipe : Tshamahansi to Sekuruwe - including temporary storage, (8)Tshamahansi Cluster : Tshamahansi Village (8a) Tshamahansi Cluster : Fencing (8b) Tshamahansi Cluster : Storage Tanks and Chambers (8c) Tshamah | R 1 012 369 000,00 | R 468 000 823,00 | R 0,00 | 2007/08 |
| Limpopo | LPR006 | Regional Bulk | Feasibility | Tzaneen LM | Nwamitwa RWS Scheme(Great Letaba) | Supply raw water from the Groot Letaba River, and in future from the Nwamitwa Dam to be constructed to the Nkambaku Water Treatment Works where it will be purified and distributed to some 350 000 people in Letaba, Tzaneen and Giyani Local Municipalities | R 644 000 000,00 | R 0,00 | R 0,00 | Unknown |
| Limpopo | LPR002 | Water | Feasibility | North east from Makhado (Louis Trichardt) | Nzhelele Valley Bulk Water Supply | The purpose of this study is to identify the most appropriate water supply strategy for the Nzhelele Valley giving full consideration to all the available water resources within the Nzhhelele Valley borders as well as the integration with other bulk water supply schemes.
| R 600 000 000,00 | R 541 523,00 | R 0,00 | Unknown |
| Limpopo | LPR001 | Water | Feasibility | 15 villages which is located halfway between Polokwane and Loius trichards (Makhado). | Matoks Regional Water Scheme | Matoks Regional Bulk Water Scheme
scoping report
technical feasibility report
IRS report | R 0,00 | R 1 763 934,00 | R 0,00 | Unknown |
| Limpopo | LPR008 | Water | Feasibility | POLOKWNA LOCAL MUNICIPALITY | Glen Alphine Regional Water Supply | Obtain the latest existing infrastructure status.
Obtain the latest existing population and growth figures.
Primary Water Requirement.
Assist in compiling Water Use Licenses.
Reconfirm design details as per original report.
Assist in appointing an Environmental Consultant
Assist in negotiations with the municipalities involved on the implementation process.
| R 345 000 000,00 | R 598 603,00 | R 0,00 | 2016/17 |
| Limpopo | LPR003 | Regional Bulk | Feasibility | The Waterberg District Municipality comprises of six local municipalities namely Mogalakwena, Lephal | Lephalale - Bulk Water Augmentation | SCOPING REPORT
TECHNICAL FEASIBILITY REPORT
PRELIMINARY DESIGN REPORT
IMPLEMENTATION READINESS STUDY REPORT | R 0,00 | R 1 482 400,00 | R 0,00 | Unknown |
| Limpopo | LPR004 | Raw Water Bulk | Feasibility | Bela Bela local municipality
modimolle
mookgopong | Magalies Water to Waterberg | Magalies Water to Waterberg.
scoping report
technical feasibility study
preliminary design
implementation ready studies | R 0,00 | R 701 683,00 | R 0,00 | 2015/16 |
| Limpopo | LPR020 | Regional Bulk | Feasibility | Musina,Vhembe,Makhado,Mutale and Thulamela. | Provincial High Catalytic Projects - Mutash Hub Bulk Water Supply | Provincial High Catalytic Projects - Mutash Hub | R 0,00 | R 1 952 332,00 | R 0,00 | 2015/16 |
| Limpopo | LPR022 | Regional Bulk | Feasibility | Aganang Local Municipality area is situated 20 km North West of Polokwane and 45 km North of Mokopan | Aganang Bulk Water Supply | Aganang Bulk Water Supply
scoping report
technical feasibility study report
Preliminary Design Report
Implementation Readiness Studies | R 38 000 000,00 | R 661 000,00 | R 0,00 | 2015/16 |
| Limpopo | LPR023 | Regional Bulk | Feasibility | Polokwane | Polokwane Waste Water Treatment Works | Advanced BNR Activated Sludge Process with surface mounted aerators
Extended Aeration Activated Sludge Process mounted aerators
MBR Membrane Reactor Process
Scoping report
technical feasibility study report
| R 113 269 000,00 | R 1 269 000,00 | R 0,00 | 2015/16 |
| Limpopo | LPR024 | Regional Bulk | Feasibility | | Capricorn Masterplan | Capricorn Masterplan | R 0,00 | R 405 000,00 | R 0,00 | Unknown |
| Limpopo | LPR025 | Regional Bulk | Planning | | Sekhukhune Masterplan | Sekhukhune Masterplan | R 500 000,00 | R 300 000,00 | R 0,00 | Unknown |
| Limpopo | LPR021 | Raw Water Bulk | Construction | | Sekhukhune Bulk Water Supply (Moutse) | Bulk Water Supply to the Jane Furse and Nebo Plateau areas supplied from the De Hoop Dam. First address the Moutse Bulk Water Supply Scheme | R 208 000 000,00 | R 246 586 728,00 | R 0,00 | 2013/14 |
| Limpopo | LPR016 | Raw Water Bulk | Construction | Vhembe DM 18 rural villages | Sinthumule Kutama Bulk Water Augmentation | The project entails the Bulk Water Supply (BWS) for Makhado, Sinthumule/Kutama, the Louis Trichardt Air Force Base (AFB) and it’s residential area, Braambos, which lies approximately 25 km South-West from Makhado town (formerly Louis Trichardt), the Sinthumule/Kutama rural villages to the west of Makhado town and Makhado town which includes all extensions in Makhado town, Tshikota and the Kutama Sinthumule Maximum Security Prison. The proposed connector lines from the Nooitgedacht boreholes to the proposed future balancing tank and pumping station at Nooitgedacht. Ground water will be pumped from Nooitgedacht pumping facility to Mowkop reservoir to supply Makhado town and extensions with additional water. The proposed pumping station and balancing tank at Nooitgedacht will be designed to ultimately supply water from Nandoni Water Treatment Works to Zones A,B,C and the Louis Trichardt Air Force base. The pumps designed for the ultimate scheme at Nooitgedacht will be utilized to pump to | R 477 600 000,00 | R 203 694 271,00 | R 0,00 | 2007/08 |
| Limpopo | LPR009 | Regional Bulk | Feasibility | | Lebalelo Central & North Regional Water Scheme | Lebalelo Central & North Regional Water Scheme | R 120 000 000,00 | R 10 000 000,00 | R 0,00 | 2015/16 |
| Limpopo | LPR007 | Regional Bulk | Feasibility | SEKHUKHUNE | Ohrigstad Bulk Water Supply | WATER SUPPLY AT SEKHUKHUNE | R 0,00 | R 79 619,00 | R 0,00 | 2016/17 |
| Mpumalanga | MPR027 | Regional Bulk | Feasibility | Chief Albert Luthuli | Amsterdam and Sheepmore bulk water scheme | Amsterdam and Sheepmore bulk water scheme | R 30 503 008,00 | R 8 581 370,00 | R 0,00 | 2015/16 |
| Mpumalanga | MPR007 | Regional Bulk | Completed | Nkomazi/ Mbekisburg x2/ Hectorspruit | Mjejane Trust Bulk Water Supply | Mjejane Trust Bulk Water Supply. Abstraction from Crocodile River, raw water dam, water treatment plant and water supply to Mbekisburg. Unfortunately the co-funding was not available and the project was never completed | R 17 500 000,00 | R 0,00 | R 0,00 | 2007/08 |