27 DMs: Provincial [NAT]
Show Customization Window
Export to XLS
Export to XLSX
Export to CSV
v
Region Not filtered
Project Code Not filtered
Asset Type Not filtered
Project Status Not filtered
Physical location Not filtered
Project Name Not filtered
Project Description Not filtered
Total Project Cost Not filtered
Total Funding Not filtered
Current Year Funding Not filtered
Project Start Date Not filtered
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Eastern CapeZLSMH01WaterConstruction Flag Boshielo RWS Interventions Ephriam MohaleRefurbishment, O&M, Water Resources and Extension Interventions to ensure WS to villages in the Water Supply SchemeR 25 919 000,00R 11 070 153,00R 0,002013/14
Eastern CapeZEC027WaterUnknown Enjakazi and Surrounds RWHTEquip each HH with a rain water harvesting tank as an interim solutionR 9 112 500,00R 9 112 500,00R 6 200 000,002014/15
Eastern CapeZEC028WaterUnknown Elunweleni and Surrounds RWHTEquip each HH with a rain water harvesting tank as an interim solutionR 9 112 500,00R 9 112 500,00R 6 200 000,002014/15
Eastern CapeZEC047WaterUnknown Bonga (Spethu) Scheme DevelopmentConstruction of 100kl reservoir with reticulation networkR 3 800 000,00R 3 800 000,00R 3 100 000,002014/15
Eastern CapeZEC055WaterUnknown Idutywa East RWHTEquip each HH with a rain water harvesting tank as an interim solutionR 9 112 500,00R 9 112 500,00R 6 200 000,002014/15
Eastern CapeZEC075WaterUnknown Qunu Emergency Water SupplyAvailability of elevated steel tank, drill and equip borehole, emergency generator, water tanker, honey sucker and supply rain water harvesting tanks to deal with the emergency water supply in Mthatha town and QunuR 5 100 000,00R 5 100 000,00R 0,002014/15
Eastern CapeZEC076WaterUnknown Upgrade the existing water supply at the Mqhekezweni villageConstruct and equip borehole pump station, construc rising, bulk and reticulation mains and construct 10 X communal standpipesR 4 500 000,00R 4 500 000,00R 0,002014/15
Eastern CapeZEC077WaterUnknown Spring protection and cart water to Villages in Ward 1Spring protection and cart water to Villages in Ward 1R 15 000 000,00R 15 000 000,00R 10 000 000,002014/15
Eastern CapeZEC078WaterUnknown Borehole developement in Wards 6, 14, 15, 17, 19, and 28Drilling and testing of new boreholesR 19 500 000,00R 19 500 000,00R 15 000 000,002014/15
Eastern CapeZEC079WaterUnknown Borehole development within Ward 3 and Ward 7Drilling of boreholesR 44 000 000,00R 44 000 000,00R 34 000 000,002014/15
Eastern CapeZEC080WaterUnknown Borehole development within Ward 9 and Ward 16Drilling of boreholesR 27 000 000,00R 27 000 000,00R 20 000 000,002014/15
Eastern CapeZEC091WaterUnknown Debeza, Lwandlana and surrounds Borehole DevelopmentDrilling of boreholesR 18 000 000,00R 18 000 000,00R 8 000 000,002014/15
Eastern CapeZEC095WaterUnknown Tholeni Spring protectionProtect springs and drill and equip boreholesR 19 975 888,00R 19 975 888,00R 17 000 000,002014/15
Eastern CapeZEC101WaterUnknown Bhakaneni and surrounds within Ward 1 and 3 Borehole DevelopmentDrilling of boreholes and installation of mobile purifiersR 11 500 000,00R 11 500 000,00R 7 000 000,002014/15
Eastern CapeZEC114WaterUnknown Qhephu Scheme DevelopmentExtension of 7 taps, capture of spring, increase store capacity and reticulate to villagesR 2 800 000,00R 2 800 000,00R 2 400 000,002014/15
Eastern CapeZEC115WaterUnknown Kumba and the remainder of Ward 4 Borehole developmentDrill and equip three (3) boreholes, bulk pipeline, reticulation, 8 standpipes and reservoirsR 2 000 000,00R 2 000 000,00R 1 000 000,002014/15
Eastern CapeZEC124WaterUnknown Toleni RWHTEquip each HH with a rain water harvesting tank as an interim solutionR 2 500 000,00R 2 500 000,00R 0,002014/15
Eastern CapeZEC141WaterUnknown Development of a District wide Master PlanDevelopment of a District wide Master PlanR 1 500 000,00R 1 500 000,00R 0,002014/15
Eastern CapeZEC143WaterUnknown Implementation of a Refurbishment Programme and implement small extentions to existing schemes district wideImplementation of a Refurbishment Programme and implement small extentions to existing schemes district wideR 74 862 500,00R 74 862 500,00R 66 000 000,002014/15
Eastern CapeZEC144WaterUnknown Abiniza Borehole developmentDrill and equip borehole and increase storage tankR 3 600 000,00R 3 600 000,00R 2 400 000,002014/15
Eastern CapeZEC145WaterUnknown Bholowreni Borehole developmentDrill and equip borehole and increase storage tankR 3 400 000,00R 3 400 000,00R 2 400 000,002014/15
Eastern CapeZEC146WaterUnknown Mpheni Borehole developmentDrill and equip borehole and increase storage tankR 3 600 000,00R 3 600 000,00R 2 400 000,002014/15
Eastern CapeZEC147WaterUnknown Qbangeni Borehole developmentDrill and equip borehole and increase storage tankR 2 800 000,00R 2 800 000,00R 2 400 000,002014/15
Eastern CapeZEC148WaterUnknown Khaleni Refurbishment and Borehole developmentDrill and equip borehole and increase storage tank, refurbish boreholes, pipes and tapsR 5 857 000,00R 5 857 000,00R 4 200 000,002014/15
Eastern CapeZEC149WaterUnknown Mpisi Borehole DevelopmentDrill and equip borehole and increase storage tankR 2 600 000,00R 2 600 000,00R 2 400 000,002014/15
Eastern CapeZEC150WaterUnknown Tshamathe Refurbisment and Storage AugmentationRefurbish borehole, pipes and taps and increase storage capacityR 2 600 000,00R 2 600 000,00R 2 400 000,002014/15
Eastern CapeZEC151WaterUnknown Harry Gwala and Maluti and surrounds borehole development and refurbishmentDrill and equip borehole, construct rising main pipelines and storage and refurbish pipelineR 10 900 000,00R 10 900 000,00R 4 800 000,002014/15
Eastern CapeZEC152WaterUnknown Bethel Outspan Borehole DevelopmentDrill and equip borehole, construct rising main pipelinesR 3 800 000,00R 3 800 000,00R 3 200 000,002014/15
Eastern CapeZEC153WaterUnknown Black Diamond Borehole developmentDrill three (3) boreholes. storage tank and delivery lineR 2 500 000,00R 2 500 000,00R 2 000 000,002014/15
Eastern CapeZEC154WaterUnknown Mavundleni RWHTEquip eaxh household with a RWHTR 1 800 000,00R 1 800 000,00R 1 300 000,002014/15
Eastern CapeZEC155WaterUnknown Mechachaneg Scheme extensionExtend the exisitng scheme by installing six (6) standpipesR 1 600 000,00R 1 600 000,00R 1 400 000,002014/15
Eastern CapeZEC156WaterUnknown Mpofini Borehole development and RefurbishmentTest and equip borehole, refurbish rising main and reservoir and standpipesR 2 800 000,00R 2 800 000,00R 2 500 000,002014/15
Eastern CapeZEC157WaterUnknown Cola Borehole developmentDrill and equip three (3) boreholes, bulk pipeline, reticulation, eight (8) standpipes and reservoirsR 2 700 000,00R 2 700 000,00R 2 400 000,002014/15
Eastern CapeZEC158WaterUnknown Monhlonyaneng Spring CapturingCapture of spring, reservoir, reticulate to villages and install 5 tapsR 3 000 000,00R 3 000 000,00R 2 000 000,002014/15
Eastern CapeZEC159WaterUnknown Vane Borehole DevelopmentDrill borehole and construct bulk rising mainR 2 600 000,00R 2 600 000,00R 2 400 000,002014/15
Eastern CapeZEC160WaterUnknown Lunzwane Spring developmentCapture of spring, reservoir, five taps and boreholeR 2 600 000,00R 2 600 000,00R 2 400 000,002014/15
Eastern CapeZEC161WaterUnknown Mount Ayliff Pipe replacementInstall 160mm PVC main to assist with ring feedR 2 900 000,00R 2 900 000,00R 2 400 000,002014/15
Eastern CapeZEC162WaterUnknown Mqhekezweni Spring developmentConstruction of spring with storage facilities, reticulation network and standpipesR 3 000 000,00R 3 000 000,00R 2 500 000,002014/15
Eastern CapeZEC163WaterUnknown Ngwegweni Spring developmentConstruction of spring with storage facilities, reticulation network and standpipesR 2 840 000,00R 2 840 000,00R 2 440 000,002014/15
Eastern CapeZEC164WaterUnknown Gugwini Borehole DevelopmentDrilling of borehole with rising mainR 2 300 000,00R 2 300 000,00R 1 300 000,002014/15
Eastern CapeZEC165WaterUnknown Mount Frere Scheme Extension and Increase Storage CapacityInstall 160mm PVC main to assist with the ring feed and constrict a 310 Kl reservoir and associated pipe workR 4 791 000,00R 4 791 000,00R 3 691 000,002014/15
Eastern CapeZEC166WaterUnknown Ndakeni Scheme Upgrade and refurbishmentConstruct 100kl Reservoir and weir. Refurbishment of pipe networkR 2 700 000,00R 2 700 000,00R 2 200 000,002014/15
Eastern CapeZEC167WaterUnknown Nkanji / Dambeni Scheme DevelopmentConstruct a 100kl reservoir with reticulation networkR 2 500 000,00R 2 500 000,00R 2 200 000,002014/15
Eastern CapeZEC168WaterUnknown Cwelingkunku-KwaMakaula Scheme DevelopmentCapture of spring with construction of 120kl storage tank, reticulation network and standpipesR 3 100 000,00R 3 100 000,00R 2 500 000,002014/15
Eastern CapeZEC169WaterUnknown Nyleni Borehole developmentDrilling of borehole, erect elevated tank with reticulation and standpipesR 2 700 000,00R 2 700 000,00R 2 500 000,002014/15
Eastern CapeZEC170WaterUnknown Quadu Spring developmentCapture spring with rising main with booster pumpR 3 500 000,00R 3 500 000,00R 3 000 000,002014/15
Eastern CapeZEC171WaterUnknown Buffalo neck / Njijini Scheme UpgradeUpgrade existing pumping main to 110mm, construct 110kl reservoir and 4.5km gravity mainR 3 500 000,00R 3 500 000,00R 2 500 000,002014/15
Eastern CapeZEC172WaterUnknown Mtshazi Scheme DevelopmentConstruct spring with storage reservoir and standpipesR 2 900 000,00R 2 900 000,00R 2 700 000,002014/15
Eastern CapeZEC173WaterUnknown Lugangeni Scheme DevelopmentCapture spring, install gravity main and a 150kl reservoirR 2 840 000,00R 2 840 000,00R 2 440 000,002014/15
Eastern CapeZEC174WaterUnknown Mjikelweni Borehole DevelopmentDrilling of borehole and rising mainR 3 200 000,00R 3 200 000,00R 2 600 000,002014/15
Pages: 1 - 9 (433 items)Prev[1]23456789Next v