15 Mining Areas: Provincial [NAT]
Show Customization Window
Export to XLS
Export to XLSX
Export to CSV
v
Region Not filtered
Project Code Not filtered
Asset Type Not filtered
Project Status Not filtered
Physical location Not filtered
Project Name Not filtered
Project Description Not filtered
Total Project Cost Not filtered
Total Funding Not filtered
Current Year Funding Not filtered
Project Start Date Not filtered
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Open filter row popup menu
Free StateACIP -683Raw Water BulkConstructionLetsemeng- JacobsdalLetsemeng - Upgrading of Jacobsdal raw water CanalThe project entails the refurment of the existing raw water canal from the Kalkfontein dam to the water treatment works. R 3 000 000,00R 3 000 000,00R 0,002013/14
Free StateACIP -714Water and SanitationConstructionSetsoto Ficksburg/ MeqhelengSetsoto - Ficksburg sewer network upgrading (Phase 3)Upgrading of the sewer outfall line, WWTW outlet and connectin of functional toilets to the reticulation network R 3 800 000,00R 3 800 000,00R 0,002013/14
Free StateACIP -715Water and SanitationConstructionSetsotoSetsoto - Refurbishment of Clocolan WWTWConstruction of the sewer pumpstations, sewer mains and refurbishment of the WWTW. R 8 040 000,00R 9 410 000,00R 0,002013/14
Free StateACIP -717WaterConstructionNaledi-WepenaarNaledi - Refurbishment of Wepenaar WWTWCleaning of the oxidation ponds and refurbishment of the mechanical and electrical works R 2 250 000,00R 4 433 320,59R 0,002013/14
Free StateACIP -701WaterTenderLetsemengLetsemeng - Letsemeng LM WC/DMInstallation of the water meters and leak detection and repairs R 10 000 000,00R 10 000 000,00R 0,002013/14
Free StateACIP2013WaterConstructionNgwathe; Coppies, Vredeford and PerysProvision of water security in for Perys, Coppies and VredefordThe water security for the municipality is to the service delivery to the 3 town namely; Vredeford, Coppies and PerysR 5 560 000,00R 0,00R 0,002013/14
GautengACIP -684UnknownUnknownDWADWA - Integrated Vaal River system, Illegal use R 3 000 000,00R 3 000 000,00R 0,00Unknown
GautengACIP -685UnknownUnknownEkurhuleniEkurhuleni - WCDM Interventions R 9 550 000,00R 9 550 000,00R 0,00Unknown
LimpopoWP10719Water and SanitationInterim InterventionsLephalale LM (MARAPONG BULK WATER SUPPLY).Lephalale - WCDM InterventionsActivity 1: Consumer Demand Management Activity 2: Conduct domestic meter audit, repair/replace and finally develop meter management policy Activity 3: Conduct awareness and education campaign Activity 4: Enhance operation and maintenance of discrete system zones and district metered areas Activity 5: Conduct household water audit, retrofitting and repair leaks Activity 6: Installation of household meters in Marapong. R 4 280 000,00R 5 879 000,00R 0,00Unknown
LimpopoACIP -687WaterInterim InterventionsMogalakwena LMMogalakwena - WCDM Interventionswater balance,network sectorization to establish DMA 's and Zones,leak detection and repair programme,repair, replace bulk water meters for large consumers, disbursement.R 15 000 000,00R 21 668 968,19R 0,002011/12
LimpopoACIP -678WaterInterim InterventionsVHEMBE DMVhembe DM - Tshilidziniequip 1 new borehole for 3.0 on hospital site with submersible pump and pumping line to existing tank 30m high elevated tank steel panel tank 300kl with associated pipeworks new pumpstation and pumps for pumping water from the existing tank to the new elevated tank pressure sustaining valve in the vondo pipeline for water securityR 2 274 519,15R 198 982 000,00R 0,002012/13
LimpopoACIP -679Water and SanitationInterim InterventionsVhembe DMSekhukhune DM - MahlakwenaConstruction of two sectional steel tanks, 160KL and 40KL respectively. Construction of 1.8km bulk water supply line from Steelpoort Water Treatement Works’s reservoir. Construction of approximately 6km internal reticulation pipelines up to thirteen standtaps. R 3 640 000,00R 4 063 000,00R 0,00Unknown
LimpopoLP1410Raw Water BulkInterim InterventionsMopani. The Muyexe village lies approximately 25 kilometres north-east of Giyani.    Mopani - MuyexeWater services to the Muyexe village are supplied by Mopani District Municipality as a Water Services Authority. Muyexe is one of the villages within Pipeline F water supply scheme and is primarily fed from the Nsami Dam. The Scope outlines the construction of a bulk water supply line from the Command Reservoir at Thompson, then gravitate to Muyexe via Muhlava Vhelemu. The construction a new elevated 400kl tank at Thompson to be fed from a new proposed pipeline from the well points (boreholes) behind Nsami Dam. The supply line (10 178 m )(Phase 2) will pump from four (4) (yielding 10.66 l/s) boreholes to the elevated 400kl tank at Thompson and the gravity line (Phase 1) (8 130m) will gravitate to Muyexe. Phase 2 will also entail the development of underground water from the well points behind the Nsami Dam wall. R 11 346 000,00R 11 298 238,78R 0,002012/13
LimpopoACIP -681WaterInterim InterventionsMopani DMMopani - Giyane pipelin Creplacement of the existing 3.7 km long fibre cement bulk water supply pipeline (pipeline C) with a new 350 mm steel pipeline refurbishment of the pumps,pipeworks and valves at the Giyani booster pump station and refurbishment of the electrical switchgear.R 1 577 000,00R 13 027 000,00R 0,00Unknown
LimpopoLP1504Internal BulkInterim InterventionsWATERBERG MUNICIPALITY THABAZIMBI WATER SUPPLYTHABAZIMBI WATER SUPPLYDESIGN,CONSTRUCTION AND SUPERVISION.R 1 000 000,00R 1 000 000,00R 0,002014/15
LimpopoLP-43-13-02Internal BulkDesign/ TenderGa-SelekaRefurbishment of infrastructure at Ga-SelekaGa-Seleka: 2*3 KL steel storage tank and redrill, three additional boreholes, equip, construct cage, electrical 4km pipeline, refurbishment of reticulationR 3 000 000,00R 3 000 000,00R 0,002013/14
LimpopoW0030WTEWaterCompletedSekhukhune DMSekhukhune DM - Mahlakwena water SupplySupply pipeline from the Steelpoort Water Treatment works to the Mahlakwena village. Construction of two sectional steel tanks, 160KL and 40KL respectively. Construction of 1.8km bulk water supply line from Steelpoort Water Treatement Works’s reservoir with the construction of approximately 6km internal reticulation pipelines up to thirteen standtaps. R 3 640 000,00R 3 640 000,00R 0,002012/13
LimpopoWP0485WTE WaterInterim InterventionsBela BelaRapotokwane Water Supply Project Site clearance. Bulk Earthworks. Pipe laying 7.5km pumping mains. Siting and development of boreholes (to provide 4.5l/s water). Equipping of three successful boreholes. Testing existing boreholes and refurbishment. Pipe Jacking. Supply and installation of 400kl steel tank. Construction of manhole chambers i.e. air valve, scour valve. Electrification of boreholes. Testing and Commissioning. R 13 851 000,00R 11 150 000,00R 0,002001/02
LimpopoMD001WaterInterim InterventionsVhembe DM NORTH EAST OF MALAMULELEMakhubele Damclearing large trees and plant growth the construction site, upgrading of the spilway and embankment wall to acceptable engineering starndard,installation of a toedrain,outlet pipe and down stream valveR 582 776,65R 0,00R 0,002011/12
LimpopoVDM/TECH/07/03/2011/01WaterInterim InterventionsVhembe DM ThohoyandouMUKULA WATER SUPPLYUPGRADING OF DANAMI WATER TREATMENT WORKS,UPGRADING OF CLEAR WATER PUMPU STATION,PARALLEL PIPELINE TO RESERVOIR RD17, NEW GRAVITY SUPPLY TO MUKULA, NEW 2.5 ML RESERVOIR AND BOOSTER PUMP STATION FOR MUKULA. R 21 789 386,30R 2 100 000,00R 0,002011/12
LimpopoLP1501WaterInterim InterventionsSekhukhune DMMOOKGOPONG WATER SUPPLYPlanning, Design and Construction Supervision of Mookgopong Water Supply in Waterberg District Municipality R 1 363 030,23R 3 566,00R 0,002014/15
LimpopoACIP -731Regional BulkFeasibilitySekhukhune District Municipality Marble Hall Town.Sekhukhune - Refurb of Marble Hall WWTWUpgrading and installation of Electrical Supply and Installation of Mechanical equipment and desludging of oxidation ponds.R 3 000 000,00R 8 328 360,29R 0,002012/13
LimpopoACIP -732AMD MitigationInterim InterventionsLephalaleLephalale - Refurb of Sewage Pumpstationsdesigns and report for the collapse sewer pump station No.2 in the town of Lephalale.R 8 430 000,00R 3 800 000,00R 0,002012/13
LimpopoACIP -733WaterInterim InterventionsVhembe DMVhembe - Refurb of the WWTW (Musina)installation of mechanical intake screen,cleaning of primary and secondary ponds,repairs of airators, repair sludge pumps to dring beds and emptying and refurbishment of drying beds structure and filter media.construction of sludge drying beds and associated electro mechnical system and pumping system,R 4 590 885,00R 1 918 000,00R 0,002012/13
MpumalangaACIP -713WaterConstructionMashishing/ LydenburgThaba Chweu - Bulk Metering (30)Thaba Chweu water demand and conservationR 2 195 091,52R 2 500 000,00R 0,002013/14
MpumalangaACIP -718Water and SanitationCompletedEmalahleniEmalahleni - Ferrobank WWTWRefurbishment of Ferrobank Waste Water Treatment worksR 2 000 000,00R 2 000 000,00R 0,002012/13
MpumalangaACIP -719WaterCompletedCarolinaAlbert Luthuli - CarolinaInstallation of 5ml Water Package PlantR 3 000 000,00R 3 000 000,00R 0,002013/14
MpumalangaACIP -720Water and SanitationConstructionKomatipoortNkomazi - Refurbishment of Komatipoort WWTWRefurbishment of Komatipoort Waste Water Treatment WorksR 6 254 000,00R 7 000 000,00R 0,002013/14
MpumalangaACIP -721Water and SanitationConstructionMalelaneNkomazi - Refurbishment of Mhlatikop WWTWRefurbishment of inlet works, refurbishment and cleaning of all 3 Biological reactors, sedimentation tanks, chlorination room amd system, drying beds, mess room and replacement of grating, handrailings and flow 2 meters.R 2 771 165,61R 3 000 000,00R 0,002013/14
MpumalangaACIP -722Water and SanitationConstructionLeandraGovan Mbeki - Leandra WWTWRefurbishment of Leandra Waste Water Treatment WorksR 24 995 000,00R 3 000 000,00R 0,002013/14
North WestACIP -682WaterConstructionNgaka ModiriNgaka Modiri - Ottosdal Water ReticulationThe project entails the extension of the network, hydrological exploration and development of additional boreholes to supplement the already stressed potable water supply to Ottosdal. The project is partly funded by MIG and has commenced in FY2013R 2 000 000,00R 2 000 000,00R 0,002013/14
North WestACIP -745UnknownUnknownNgaka ModiriNgaka Modiri - Refurb of Motswedi WWTW R 1 500 000,00R 1 500 000,00R 0,00Unknown
North WestACIP -746UnknownUnknownNgaka ModiriNgaka Modiri - Refurb of Mafeking pumpstations R 5 000 000,00R 5 000 000,00R 0,00Unknown
North WestACIP -709WaterOperationalBojanalaBojanala - KgetlengRivier WC/WDMTechnical, economic, social and legislative and institutional interventions towards the reduction of non-revenue water. Activities will include customer metering, identification and repair of leaks, improved bulk metering and pressure management, policy and bylaw development, customer awareness campaigns, review of tariffs and billing system and establishment of incentives scheme.R 4 000 000,00R 4 000 000,00R 0,002013/14
North WestACIP -710WaterConstructionBojanalaBojanala - Madibeng WC/WDWCDM - the supply and installation of bulk meters (intake and delivery), zone meters, data recorders and Telemetry R 2 000 000,00R 2 000 000,00R 0,00Unknown
North WestACIP -711WaterCompletedBojanalaBojanala - Moretele/bulk meter installationWCDM - The development of a water conservation culture to consumers in Ratsiepane and Makapaanstad, inform consumers through a social intervention - responsibilities and ways to conserve water, the identification of discrete consumption zones that can be isolated, isolate identified zones where the best return on investment can be expected, repair all visible leaks and malfunctioning meters in the two villages and upgrade existing connections where required (subject to on site assessment) R 2 000 000,00R 2 000 000,00R 0,00Unknown
North WestACIP -712WaterCompletedMoses KotaneMoses Kotane - wd/wdmTechnical, economic, social and legislative and institutional interventions towards the reduction of non-revenue water. Activities will include customer metering, identification and repair of leaks, improved bulk metering and pressure management, policy and bylaw development, customer awareness campaigns, review of tariffs and billing system and establishment of incentives scheme.R 5 000 000,00R 5 000 000,00R 0,00Unknown
Pages: 1 - 1 (37 items)Prev[1]Next v